Our range of products

Product categories

  • 04  Wire and wire products
  • 04.01  Wire and bar material
  • 04.01.02  Wire, related to its material: Iron and steel
  • 04.01.02.05  Steel wire with metallic coating

Our products

Product category: Steel wire with metallic coating

Wire VR-1 class

Material                            St1-St3
Quantity of bends        from 4
Diametr range from     3,0 to 5,0 mm
Coil weights                    to 1000 kg
Puckage                           Coil
Use                                     Reinforcing concrete

More Less

Product category: Steel wire with metallic coating

Carbon wire (incl. spring wire)

Material                            Ct 55, Ct 70, sae 1030, sae 1069
Tensile strength            from 1000 to 2200 N/mm
Wire diameters              from 0,8 to 5,0 mm
Coil weight                      from 25 to 1000 kg
Package                            In bays and rosettes pulled by a metal ribbon in 4 places
Use                                     Manufacture of various types of springs and nets

More Less

Product category: Steel wire with metallic coating

General-purpose wire thermally treated (black)

Material                      St1-3
Tensile strenght      from 290 to 500 N/mm
Wire diameters        from 1,0 to 6,0 mm
Coil weight                from 25 tо 600 kg
Packing                       direct winded coils and coils type rosette
Use                               hay building, scrap paper baling, cotton baling etc.

More Less

About us

Company details

Company Garant Metiz Invest, was founded in 2005 in Dnepropetrovsk. As part of the 10 people it had worked out a business construction plan of metal products for the plant.

In 2006, the company acquired as part of remediation, industrial building at the plant Elektrongaz , Yellow Waters. In March-April, all relevant negotiations, which resulted in an agreement for the purchase of equipment and already start financing business this project was given in May 2006 at the expense of their own and credit resources provided by Ukrainian and foreign financial institutions have been carried out. It purchased the equipment of leading world companies in its segment engineering and infrastructure for them, namely the drawing machines produced by KOCH, Germany, wire galvanizing line in the composition of I.C.E. Group, Canada, M + E, Italy, as well as the infrastructure for equipment submitted as part of Boxy, Bremer, Paramount, BT, Carrara, Traxit, Henkel and so on.

It should be noted that the purchased equipment is equipment the 4th generation with high performance and reduced power consumption of up to 30-50% compared with the equipment of the 3rd generation (gas, electricity, water). A large proportion of the investment project was spent on the implementation of systems to reduce or eliminate the load on the ecological system of Ukraine: recycling waste solutions is a closed cycle, purchased a high-quality US equipment firm Canadian Oliver Dorn , which makes the processing of waste solutions automatically mounted exhaust ventilation? of plastics, which provides its durability. Installed filter system of American-Belarusian company Imatek and K , which guarantees 99.995% filtration.

Performance Hardware Plant, which is located in the production area of about 14,000 m2 is approximately 40,000 tons of metal products (wire, general purpose heat-untreated uncoated wire, general purpose heat-treated uncoated wire for reinforcement JBK VR-1 class, the wire with zinc coated construction nails, etc.) per year.

We have already opened 180 jobs in manufacturing and construction period attracted the company, which opened 120 jobs for construction personnel. the first phase of equipment put into operation in late 2007, the second stage Equipment for the production of zinc-coated wire put in commissioning mode in the 1st quarter of 2008. A pilot batch of products derived 12.04.08, industrial commissioning is planned in the 2nd quarter of 2008. Third place wire products (mesh, fiber, etc.) is scheduled to start financing in the 4th quarter of 2008.

The total planned investment in the first two phase of the project is about 10 million. Euro. The number of jobs at the end of the construction of the industrial complex will be about 300 people. We invite you to work with our enterprise, which will offer you a high quality of product and excellent service.