New electricity motorways are to transport wind power from the north to the south of Germany in future
Published by: Federal Network Agency
© GeoBasis-DE / BKG 2023
© Transmission system operator Status: 30.06.2023
A converter system built in 2021 by grid operator TenneT in Wilster, Schleswig-Holstein
Opening of the SuedOstLink construction work in Isar: Minister President Markus Söder and Minister of State Hubert Aiwanger present pieces of an HVDC cable as part of the local team
SuedLink underground cable from the Prysmian Group
Underground cable work for NordLink: Underground cable conduits are made of particularly hard-wearing materials